Slideway liner is not heavy, and it is not fragile in the way glass is fragile. It fails in transit for two quieter reasons: it is long and thin, so it takes a set when it is bent or stacked, and it is a bought-in material with a specification, so a missing or vague document is enough to hold it at the port while the machine it was ordered for stands stripped. Both problems are settled at the quotation stage, not at the loading dock.
Packing is a specification, not an afterthought
A supplier will pack however is cheapest unless the order says otherwise, and the cheapest option is usually a coil bound with tape. That is fine for a 100 mm strip travelling a short distance to a workshop that will cut it the same week. It is not fine for a 305 mm sheet that has to arrive flat enough to bond without a visible wave, or for a bundle of pre-cut strips that must reach the machine in the order they will be fitted. The purchase order is where this is decided, because once the carton is closed nobody can change it.
Choose the form before you choose the carton
| Form on the order | Pack it as | Ask for this in writing |
|---|---|---|
| Continuous roll | Coiled on a core, wrapped, ends taped | Core diameter, roll width and whether the roll may be stood on end |
| Cut strips, loose | Flat stack, interleaved, banded | Maximum stack height and whether strips are packed in fitting sequence |
| Cut strips, per machine | Bundle per machine or per axis, separately labelled | Label content: machine, axis, thickness, width, length |
| Sheets for a large face | Flat, on a rigid pallet, no fold | That the sheet is not coiled at all, and the pallet footprint |
Two practical notes. First, a roll that is coiled tightly and then stored on its side for a month will keep a curve; if the strips are to be bonded straight off the roll, ask for a larger core or for the material to be packed flat. Second, cut strips are the part of an order most likely to go missing, because they are small and they are counted, not weighed. Bundling them per machine turns a counting problem into a checklist.
What to write on the purchase order about packing
- The supply form for each line: roll length, or a strip list with widths and lengths.
- Whether strips may be coiled or must ship flat.
- The unit of packing: per machine, per axis, or one bundle for the whole order.
- Label content and language, if the goods are received by someone who does not read the drawing.
- How the material is protected: interleaving, edge protection, and whether the carton is moisture-barriered.
- Whether the adhesive and paste ship in the same carton or separately, since they have their own handling needs.
Documents to line up before the goods move
| Document | Issued by | What the buyer uses it for |
|---|---|---|
| Commercial invoice | Supplier | Value and description for clearance; must match the packing list line by line |
| Packing list | Supplier | Counting cartons and bundles on arrival; the document you actually check against |
| Bill of lading or air waybill | Carrier or forwarder | Title and release of the goods; the number your forwarder tracks |
| Certificate of origin | Issuer agreed with the supplier | Only if your country or your customer requires it; confirm before the order, not after |
| Material or composition statement | Supplier | Internal filing, and any customer who asks what the liner is made of |
The description on the invoice and the description on the packing list have to match each other and match what is in the carton. A line that says "PTFE material, assorted" on one document and eight strip sizes on the other is the kind of mismatch that turns a routine clearance into a week of emails. If the order has a strip list, put the strip list on the packing list.
Marking: the cheapest part of the order to get right
- Carton number against total, so a partial delivery is obvious on the dock.
- Machine or axis on every bundle, if the order is for more than one machine.
- Thickness and width on the outside, because colour is an identifier only if everyone on site uses the same convention.
- A handling mark for flat-packed sheets, since a "this way up" arrow is ignored less often than nothing at all.
On arrival: check the paper before the material
Count cartons against the packing list before signing, photograph any crushed carton before opening it, and check the bundle labels against the machine list while the pallet is still intact. Material that has taken a set is much easier to argue about on the day of delivery than three weeks later, and a strip that arrives in the wrong thickness is a packing error, not a quality claim, only if the label and the packing list agree. The incoming inspection and storage guide covers the measurement side once the carton is open; the quantity calculator is what produces the strip list in the first place.
Questions buyers ask
Can the liner ship coiled if it will be bonded flat?
Yes, and most orders do. The risk is a set that has to be flattened before bonding, which costs time on site rather than money at the supplier. If the sheet is wide, or the workshop has no way to press it flat, ask for flat packing on a rigid pallet and accept the larger footprint.
Who decides which documents are required?
Your import broker or forwarder, for your country and your product code. Requirements differ by destination and change, so treat any list as a starting point and confirm it with them before the order ships. What the supplier controls is that the invoice, the packing list and the labels all describe the same goods.
Does packing affect the adhesive?
It can. Two-part epoxy adhesive and scraping paste are packed with their own handling and storage needs in mind, and a carton that sits in the sun on a dock is not the same as one that goes straight into a store. If the adhesive is travelling with the liner, say so on the order so it is packed and marked as a separate item.
Send the strip list, the machines it belongs to and the packing form you want, and the quotation will come back with the packing and label specification written into it. Start with the Blue liner range for stock widths and thicknesses, or send the drawing for a cut list.